Preliminary Collection of Information for Baseline Study to Support Monitoring and Evaluation of Nepal Police Modernization Project

Since FDM had already worked very closely with Nepal Police, ESP/DFID outsourced FDM to collect information for baseline study to support monitoring and evaluation of Nepal Police Modernization Project (NPMP). The purpose of the assignment was to collect information based on the existing log frame indicators of the NPMP. The information collected was presumed to strengthen the project cycle management of NPMP. However, since the log frame of NPMP was yet to be finalized, an attempt had been made to gather the relevant document related to core output areas and activities as per the Draft NPMP1 M&E Framework provided in the ToR. The other objective of the assignment was to map key documents/literature and develop a list of credible information sources and evidence both internal and external that could be factored in the corresponding outputs of NPMP log frame.

CLIENTS

  • #
  • #
  • #
  • #
  • #
  • #
  • #
  • #
  • #
  • #
  • #
  • #
  • #
  • #
  • #
  • #
  • #
  • #
  • #
  • #
  • #
  • #
  • #
  • #
  • #
  • #
  • #

LIKE US ON FACEBOOK